Atria360 logo
Atria360 logo
EV Charging

EV Charging That Accounts
for Your Actual Capacity

Atria360 plans, supplies, installs and coordinates EV-charging infrastructure around property requirements, electrical capacity and future expansion — residential, commercial, multi-residential and fleet.

Load Assessed
Before anything is quoted
Installed
Supplied and configured
Expandable
Sized for more later
Who We Install For

Residential, Commercial, Multi-Residential and Fleet

The charger is the easy part. What differs is the electrical capacity, access control and how it scales.

Residential

Home charging sized to the panel you actually have.

  • Level 2 EV chargers
  • Garage installation
  • Outdoor chargers
  • Smart chargers
  • Multi-EV setups
  • Load assessment
  • Energy-management systems
  • Future EV preparation

Commercial

Charging for staff, customers and visitors.

  • Employee charging
  • Customer charging
  • Workplace charging
  • Multi-port installations
  • Access management
  • Usage monitoring
  • Load management
  • Expansion planning

Condos & Apartments

The hardest case — shared capacity and many owners.

  • Assigned-stall charging
  • Shared charging stations
  • EV-ready infrastructure
  • Electrical-capacity planning
  • Load-management systems
  • User access
  • Scalable deployments

Fleet

Depot charging built around overnight duty cycles.

  • Fleet depots
  • Multiple chargers
  • Overnight charging
  • Energy management
  • Charger utilization
  • Fleet-system integration
How We Scope It

Capacity Before Hardware

The most common EV charging problem is not the charger — it is discovering the building cannot supply what was installed. That gets expensive after the fact.

We assess the electrical capacity first, then recommend chargers, load management and staging that fit what the property can actually deliver, with room for the next vehicle.

Load Assessment

What the service can carry today, and with what added.

Load Management

Sharing capacity intelligently instead of upgrading the service.

Staged Deployment

Install what is needed now, pre-wire for what is coming.

SYSTEM SYNC

Regulated electrical work and required electrical permitting are completed or coordinated through appropriately qualified electrical professionals.

Municipal, utility, engineering and third-party fees are quoted separately when applicable.

Start with the panel, not the charger

Send us photos of your electrical panel and we can tell you what is realistic.